
This report compares both the load forecasts provided by TESLA via EMS’ em6 and the System Operations load forecast (at 2.5 hours ahead of real-time) against actual load observations. As does the report released by Transpower, this report aggregates conforming and non-conforming load. Future reports released by Transpower may look to separate these components as EMS’ report does. EMS provides a detailed load forecasting accuracy analysis to all Load Forecast users on a monthly basis.